These package deals provide up-front pricing for our most popular upgrades when performed at B‑Haven. The cost includes all components, cabling, installation time, and also local sales tax -- the cost shown below is exactly what you will pay. These packages are compatible with and designed to fit all years of the Winnebago Travato, but in most cases can be adapted to other vans and RVs without additional cost. Customizing packages is also possible, such as supplying your own component or adding an additional component such as an additional battery, and these changes will be reflected on the final bill. After determining which package will fit your needs, continue to the Service page to sign up.

Lithium & Inverter Package Selection

To be able to run the air conditioner and the microwave and all outlets from battery power, it's necessary to select one of the packages that includes the Victron 3000 inverter. Without installing the larger inverter, the 120 volt outlets and appliances only work in the same way they did before (i.e. requires generator or limited power from an existing inverter).

Beteween the packages that include the Victron 3000 inverter there are two levels:

  • Economy: VL-xxx

    • Basic control panel for inverter on/off and current limit
    • Battery charge level available via Epoch phone app
    • No automatic generator start
  • Advanced: VAL-xxx

    • Touchscreen control panel for inverter on/off and current limit
    • Displays all power in/out of system in Watts for clear understanding
    • Remote control ability when supplied with WiFi internet connection
    • Can display Mopeka tank level and Ruuvi temperature sensor data
    • Smartshunt battery monitor, audible alarm for low battery
    • Includes Victron MPPT solar upgrade (more power from same panels)
    • Automatic generator start (charges at 10%)

Note: We are no longer recommending the Epoch 105 battery, as we have had some concerns where used with a generator, and the cost of two 105s is nearly the price of one 300. For certain RVs such as the Solis Pocket that don't have the larger upright tray (both trays are tilted) and don't have a generator, we can still provide that solution.

Travato GL and KL models

We do not have upgrade packages or pricing available for the Travato models using the Volta 48v battery system. While the VL and VAL packages come close to the features of a Volta system as an upgrade option for non-L models, replacing the Volta components for a failed system is a considerably more difficult and expensive process. We recommend working with Voltagen to rule out any possibility of repairing your existing system before considering a full replacement from another source.

LB-300 AGM to Epoch 300 AH Upgrade

  • 1 Bluetooth Heated Epoch 300 LiFePo4 battery
  • LI-BIM-225 installed replacing isolation solenoid
  • CBP-1 Converter boost plug installed in converter
  • Change zamp to LiFePo4 mode
  • Provides 3x the battery capacity of 2 brand new AGMs
  • Battery status (Charge, Volts, Amps) available via phone app
  • Does not add or upgrade inverter (won't run AC from battery)
  • This package is recommended for any year Travato with ailing AGM batteries as you can later upgrade to more battery or inverter easily
  • Note: This package is compatible with the Solis P & PX but not Pocket
Time: ~2hrs

LB-600 AGM to Epoch 600 AH Upgrade

  • 2 Bluetooth Heated Epoch 300 LiFePo4 batteries
  • LI-BIM-225 installed replacing isolation solenoid
  • CBP-1 Converter boost plug installed in converter
  • Change zamp to LiFePo4 mode
  • Provides 6x the battery capacity of 2 brand new AGMs
  • Battery status (Charge, Volts, Amps) available via phone app
  • Does not add or upgrade inverter (won't run AC from battery)
  • Note: This package is NOT compatible with Solis models
Time: ~2.5hrs

NL-600 Coachman Nova AGM to Epoch 600 AH Upgrade

  • 2 Bluetooth Heated Epoch 300 LiFePo4 batteries (replaces 3 AGM)
  • Change Solar Controller to LiFePo4 mode
  • Change Xantrex inverter to LiFePo4 mode (requires BT)
  • LI-BIM-225 installed in place of BIM-160
  • Battery status (Charge, Volts, Amps) available via phone app
  • Change Truma A/C wiring to allow it to run from inverter (softstart not required)
  • Note: This package is available only for the Coachman Nova
Time: ~3hrs

VL-600 Economy Epoch 600 AH Lithium & Inverter

  • 2 Bluetooth Heated Epoch 300 LiFePo4 batteries (~7k WH)
  • Victron 3000 Inverter/Charger
  • Simple Inverter Control Panel
  • Battery status (Charge, Volts, Amps) available via phone app
  • LI-BIM-225 (replaces isolation solenoid, boost button still works)
  • All cabling and connectors
  • Runs the air conditioner about 5+ hours (minimum)
  • Batteries installed inside when possible without sacrificing storage
  • Note: No automatic generator start available with this package
Time: ~1days

VL-900 Economy Epoch 900 AH Lithium & Inverter

  • 3 Bluetooth Heated Epoch 300 LiFePo4 batteries
  • Victron 3000 Inverter/Charger
  • Simple Inverter Control Panel
  • Battery status (Charge, Volts, Amps) available via phone app
  • LI-BIM-225 (replaces isolation solenoid, boost button still works)
  • All cabling and connectors
  • Runs the air conditioner about 8+ hours (minimum)
  • Batteries installed inside when possible without sacrificing storage
  • Note: No automatic generator start available with this package
Time: ~1days

VAL-900 Advanced Epoch 900 AH Lithium & Inverter

  • 3 Bluetooth Heated Epoch 300 LiFePo4 batteries (~11k WH)
  • Victron 3000 Inverter/Charger
  • Touchscreen display with Victron Cerbo GX controller shows full power flow details
  • Victron Smartshunt battery monitor
  • Victron MPPT Solar Controller
  • AGS-1 Auto Generator Start
  • LI-BIM-225 (replaces isolation solenoid, boost button still works)
  • All cabling and connectors
  • Third battery installed inside under bed without sacrificing storage except on G22+
  • Runs the air conditioner about 8+ hours (minimum)
Time: ~2days

VAL-1200 Advanced Epoch 1200 AH Lithium & Inverter

  • 4 Bluetooth Heated Epoch 300 LiFePo4 batteries (~15k WH)
  • Victron 3000 Inverter/Charger
  • Touchscreen display with Victron Cerbo GX controller shows full power flow details
  • Victron Smartshunt battery monitor
  • Victron MPPT Solar Controller
  • AGS-1 Auto Generator Start
  • LI-BIM-225 (replaces isolation solenoid, boost button still works)
  • All cabling and connectors
  • Third battery installed inside under bed without sacrificing storage except on G22+
  • Runs the air conditioner about 11+ hours (minimum)
Time: ~2days

BL-900 Battleborn to Epoch Upgrade

  • Upgrade from previous 400ah Battleborn (4 batteries) to 900ah Epoch (3 batteries)
  • Cost includes credit of $250 per Battleborn battery
  • Only valid for previous STG.NET upgrade customers
  • Battleborn batteries must have been installed as two underneath and two (or more) inside
  • Installations that used replacement "Rodney" trays can be upgraded at additional cost
  • Other upgrade configurations are possible but not covered by this package price, contact us for details
Time: ~3hrs

TMA-1 Thule Manual Awning

  • Thule Hideaway Awning - Roof Mount - 12' 3"
  • Replaces any Carefree leg-less awning
  • Carefree electrical control box removed (no power draw)
  • Thule awning includes legs and attachment option to van
  • Manual crank bar can be stored in rear
Time: ~1.5hr

AC-3 Furrion Chill Cube

  • Furrion Chill Cube "Inverter" Air Conditioner - 18k BTU
  • Variable speed compressor & inside fan - very quiet operation
  • No softstart needed, very low power consumption when not super hot out
  • Extends (nearly doubles) run time on battery when used with Victron 3000 inverter package
Time: ~1hr

ACF-135 ARANA BFC135L Fridge

  • Replaces Dometic RML8330 3 way fridge without cabinet mods
  • Compatible with Travato 14-18 G & certain Pleasureway models
  • Same fridge space, twice the freezer space
  • Operates on 12v battery power only, uses less power than Dometic
  • Recommend Lithium battery upgrade
  • Note! We no longer stock this fridge due to logistics issues beyond our small business. We are working with Arana to get US based distribution but this has not happened yet.